Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

(**IMPORTANT NOTE: Before installation of the Customer Display Unit, the site should already have the Lantronix Serial to IP server installed. Directions on how to install that piece of equipment can be found here-> Installing a Lantronix Serial-to-Ethernet Device

Installation Steps: 

  • Unpack and assemble the the unit.
  • The unit should look like this once assembled.



  • Open the back rubber part of the CDU with a pair of tweezers and adjust the DIP Switches accordingly.
    #5 and #7 need to be put in the UP position. All other switches need to be DOWN



  • Next, connect the serial cable from the CDU to one of the ports on the Lantronix box. 
  • Verify the COM Port that you've assigned for this CDU and update in the ECM Peripherals as needed.
  • Assign the CDU to a device peripheral in ECM.
  • Once all of this is completed, you can need to run a DEPLOY to the site and the Customer Display Unit you've attached to the iPad Device will be sending orders to it.
    COMPLETED! 

 







 




  • No labels