Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

4/25

Server Upgrades

  • Alger starts scheduling sites for Wave 1 (East Lake)

4/26

4/27

4/28

4/29

4/30

5/2

Server Upgrades

  • Alger starts scheduling sites for Wave 2 (Dornoch)

5/3

5/4

5/5

5/6

5/7

5/9

Server Upgrades

  • Alger starts scheduling sites for Wave 3 (Cypress)

5/10

5/11

5/12

5/13

5/14

5/17

5/18

5/19

4.8.3 App Release

5/1320

5/1420